Ir para o conteúdo principal

Alterações no passo nº 2

Edição por Arthur Shi

Edição aprovada por Arthur Shi

Antes
Depois
Sem alteração

Linhas do passo

-[* black] The switch is supplied with 220V so one has to be careful not to get zapped. The first thing before doing anything is to flip the breaker to the pump switch and check it with a meter to ensure it is off.
+[* icon_caution] ***WARNING: ***The switch is supplied with 220V so one has to be careful not to get zapped. The first thing before doing anything is to flip the breaker to the pump switch and check it with a meter to ensure it is off.
[* black] Remove the small nut from the cover to gain access to the switch.
[* black] With the cover removed, check for power across the switch from ***supply*** lines L1 and L2 (Blue marker). Ensure that there is 0 volt.