Alterações no passo nº 5
Edição por Valeria Covarrubias —
Edição aprovada por Valeria Covarrubias
- Antes
- Depois
- Sem alteração
Linhas do passo
- | [* black] After the track has one screw drilled |
---|---|
- | [* black] |
+ | [* black] After the track has one screw drilled, use a level to make sure your track is placed straight. |
+ | [* black] Note: Depending on your new mounts, you may or may not need to drill new holes for the screws. If you do need to drill new holes mark the holes on the mount with a sharpie. |