Ir para o conteúdo principal

Alterações no passo nº 5

Edição por Phillip Takahashi

Aguardando aprovação

Antes
Depois
Sem alteração

Linhas do passo

-[* black] Remove the four bolts securing the water tank in the same manner as step 5.
+[* black] There are 4 bolts securing the water tank to the pump base. They are located at the bottom corners of the water tank.
+[* black] Place an open end wrench on one of the bolts and another open end wrench on the bolt's nut. Turn the nut counterclockwise until it comes off.
+[* black] Remove the bolt.
+[* black] Repeat this process for the remaining three bolts.