Ir para o conteúdo principal
Inglês
Francês
Step 7
Place the new grommet and retainer over the threaded end of the new shock. Be sure that the grommet and retainer are flush against the upper control arm. Orient the grommet so that the small protrusion is against the upper control arm. Orient the retainer so that the cupped side faces the upper control arm. Place the nut onto the threaded end of the new shock and turn it clockwise with a 14 mm box end wrench or deep socket wrench until it is snug.
  • Place the new grommet and retainer over the threaded end of the new shock. Be sure that the grommet and retainer are flush against the upper control arm.

  • Orient the grommet so that the small protrusion is against the upper control arm. Orient the retainer so that the cupped side faces the upper control arm.

  • Place the nut onto the threaded end of the new shock and turn it clockwise with a 14 mm box end wrench or deep socket wrench until it is snug.

  • Factory specified tightening torque for the top nut is 19 ft-lbf or 26 N-m.

Insira tradução aqui

Insira tradução aqui

Insira tradução aqui

Insira tradução aqui

Suas contribuições são licenciadas pela licença de código aberto Creative Commons.