- | [* black] Using the black spudger, lift the flaps that fasten the connection strips. There are four total flaps to lift. Refer to the second picture for locations. The smaller of the four flaps may require you to use the point end of the spudger. |
---|
- | [* black] Once all four fasteners are lifted, use the point end of the spudger to disconnect the connection flaps. |
---|
+ | [* red] Using a spudger, lift the flaps securing the four ZIF connectors. |
---|
+ | [* icon_note] The smaller of the four flaps may require you to use the point end of the spudger. |
---|
+ | [* black] Use the pointed end of the spudger to disconnect the ribbon cables from their ZIF connectors. |
---|