Pular para o conteúdo principal

Alterações no passo #2

Edição por Henry H

Edição aprovada por Henry H

Excluído
Adicionado
Sem alteração

Linhas de Passo

[* black] Make sure the machine is turned off and unplugged.
[* black] Set your voltmeter in continuity mode and place the leads on the two 90 degree prongs on the boiler's heating element.
[* black] Note: It does not matter which lead touches which prong as you're just testing for a break, or "open" in the heating element circuit.
[* black] If the voltmeter shows 0, or "open", then there is an issue with the heating element's continuity and it needs to be replaced.
[* black] If given a reading, then proceed to step 3your heating element is fine.
[* black] If given a reading, then proceed to step 3your heating element is fine.