Alterações no passo nº 5
Linhas do passo
- | [* |
---|---|
+ | [* black] Screw clockwise, the new Teflon wrapped the threaded part of an elbow, into the pipe in the ground. |
[* icon_note] This is the location of the old sprinkler head and riser. | |
- | [* |
+ | [* black] Confirm that the part is installed snugly and not cross-threaded. |
[* icon_note] Caution: Do not over tighten. |