Ir para o conteúdo principal

Alterações no passo nº 5

Edição por PATRICIA ANN FOURNIER

Edição aprovada por PATRICIA ANN FOURNIER

Antes
Depois
Sem alteração

Linhas do passo

-[* red] Screw clockwise, the new Teflon wrapped male part of an elbow, into the pipe in the ground.
+[* red] Screw clockwise, the new Teflon wrapped the threaded part of an elbow, into the pipe in the ground.
[* icon_note] This is the location of the old sprinkler head and riser.
[* yellow] Confirm that the part is installed snugly and not cross- threaded.
[* icon_note] Caution: Do not over tighten.