Ir para o conteúdo principal

Alterações no passo nº 4

Edição por Connor

Edição aprovada por Connor

Antes
Depois
Sem alteração

Linhas do passo

[* red] For this step, wrap 4 threaded ends with Teflon tape: both ends of the flex riser and one end of each swing joint elbows.
-[* orange] Wrap Teflon tape clockwise around the threaded part of each of the above-mentioned sprinkler connections.
-[* yellow] Put three complete layers of tape on each of the threaded ends. This will allow for a tighter and secure fit.
+[* black] Wrap Teflon tape clockwise around the threaded part of each of the above-mentioned sprinkler connections.
+[* black] Put three complete layers of tape on each of the threaded ends. This will allow for a tighter and secure fit.