Ir para o conteúdo principal

Alterações no passo nº 4

Edição por PATRICIA ANN FOURNIER

Edição aprovada por PATRICIA ANN FOURNIER

Antes
Depois
Sem alteração

Linhas do passo

-[* red] For this step, there are 4 threaded ends: both ends of the flex riser and one end of each swing joint elbows.
+[* red] For this step, 4 threaded ends need to be wrapped with Teflon tape: both ends of the flex riser and one end of each swing joint elbows.
[* orange] Wrap Teflon tape clockwise around the threaded part of each of the above-mentioned sprinkler connections.
[* yellow] Put three complete layers of tape on each of the threaded ends. This will allow for a tighter and secure fit.