Ir para o conteúdo principal

Alterações no passo nº 3

Edição por Sarah Westberg

Edição aprovada por Sarah Westberg

Antes
Depois
Sem alteração

Linhas do passo

-[* black] Locate the excess length of wires inside the bass.
-[* black] These are most likely right under the bridge of the bass.
-[* red] You will cut the zip tie holding these wires in place.
-[* black] This will allow us to disassemble all parts the wires will connect to later.
+[* black] Cut the zip tie holding the excess length of wires in place, located inside the bass.
+[* icon_note] These are most likely right under the bridge of the bass.
+[* icon_note] This will allow you to disassemble all parts the wires will connect to later on in the repair.