Ir para o conteúdo principal

Alterações no passo nº 8

Edição por Karyn McBurney

Edição aprovada por Karyn McBurney

Antes
Depois
Sem alteração

Linhas do passo

-[* black] Dry fit the new piece into position (don't attach yet). It should be flush with the existing ceiling, rest on half a ceiling rafter on each side, and have a slight gap around the edges (trim the new piece or the existing ceiling edges if you need more room on a rafter to affix it securely). Pic 1.
+[* black] Dry fit the new piece into position (don't attach yet). It should be flush with the existing ceiling, rest on half a ceiling rafter on each side, and have a slight gap around the edges. Pic 1.
+[* icon_note] Trim the new piece ***or ***the existing ceiling edges if you need more room on a rafter to affix it securely.
[* black] Dry fit again after trimming. Use the framing square and pencil to draw a line from the trim arrow to the ceiling arrow you marked in Step 4. Pic 2.
-[* black] Bring the new piece back down until you have placed your screw gun and drywall screws in easy reach of your position on the ladder before you begin the installation.
+[* icon_caution] Bring the new piece back down until you have placed your screw gun and drywall screws in easy reach of your position on the ladder before you begin the installation.