Ir para o conteúdo principal

Alterações no passo nº 6

Edição por Syeed Hamid

Edição aprovada por Syeed Hamid

Antes
Depois
Sem alteração

Linhas do passo

-[* black] Line up the toilet over the bolts, then slowly lower it down until both bolts clear their respective holes. Set it down and ensure the toilet is level and straight.
+[* black] Once you have put back on the gasket (the wax ring), line up the toilet over the bolts, then slowly lower it down until both bolts clear their respective holes. Set it down and ensure the toilet is level and straight.