Ir para o conteúdo principal

Zoll Impact Uni-Vent 731 Power Knob Kit Replacement

Equipamento Médico
Nem o iFixit nem este guia de reparo são endossados ou afiliados ao fabricante do dispositivo médico.

O que você precisa

  1. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement, Power Knob Kit: passo 1, imagem 1 %32
    • Loosen but do not remove the(4) 8-32 X 3 screws on the outer air intake

    • Pg. 29

  2. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 2, imagem 1 %32
    • Loosen and remove the (2) 10-32 Keps nuts and the (4) 6-32 X 2 screws. Remove the back case by lifting from the ventilator

    • Pg. 29

  3. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 3, imagem 1 %32
    • Remove the (2) 4-40 X ¼ screws on the Dovetail Mounting Bracket and disconnect the ribbon cable on the PIM PCB by simultaneously applying pressure on the two locking “ears”

    • Pg. 29

  4. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 4, imagem 1 %32
    • Flip the ventilator over and remove the front case assembly by lifting it straight up away from the ventilator module

    • Pg. 29

  5. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 5, imagem 1 %32
    • Remove the bezel by loosening and removing the (7) 4-40 X ¼ screws that hold the bezel to the front case

    • Pg. 29

  6. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 6, imagem 1 %32
    • On the membrane panel assembly, loosen the 6-32 X ¼ set screw using a 1/16 Ball Hex Driver (located in the power knob) and lift the damaged knob from the membrane panel

    • Pg. 30

  7. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 7, imagem 1 %32
    • Place the replacement knob on the membrane panel switch -align with flat on switch –insert the included 6-32 X ¼ set screw and tighten

    • Pg. 30

  8. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 8, imagem 1 %32
    • Install the new bezel by tightening the included (7) 4-40 X ¼ screws

    • Pg. 30

  9. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 9, imagem 1 %32
    • Place the front case assembly over the vent module and tighten the (2) 4-40 X ¼ screws unto the dovetail mounting bracket. Reconnect the ribbon cable unto the PIM PCB. Make sure the two locking “ears” lock into position

    • Pg. 30

  10. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 10, imagem 1 %32
    • Attach the back case to the vent module and align cover with handle, air intake housing and dovetail mounting studs. Insert and tighten the included (2) 10-32 Keps nuts and the (4) 6-32 X 2” screws

    • Pg. 30

  11. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 11, imagem 1 %32
    • Tighten the (4) 8-32 X 3 screws on the outer air intake

    • Pg. 30

  12. Zoll Impact Uni-Vent 731 Power Knob Kit Replacement: passo 12, imagem 1 %32
    • Perform HiPot Testing then perform Calibration and Functional Test using the RCS

    • Pg. 30

Conclusão

To reassemble your device, follow these instructions in reverse order.

Emily

Membro desde: 05/04/20

206 Reputação

Autoria de 1 guia

Equipe

Cal Poly, Team S1-G5, Zimmerman Spring 2020 Membro de Cal Poly, Team S1-G5, Zimmerman Spring 2020

CPSU-ZIMMERMAN-S20S1G5

Membros da 5

Autoria de 5 guias

0 comentários

Adicione um comentário

Exibir estatísticas:

Últimas 24 horas: 0

Últimos 7 dias: 9

Últimos 30 dias: 9

Duração total: 166