Ir para o conteúdo principal

Newport e500 Power Supply Disassembly

Equipamento Médico
Nem o iFixit nem este guia de reparo são endossados ou afiliados ao fabricante do dispositivo médico.

O que você precisa

  1. Newport e500 Power Supply Disassembly, Newport e500 Top Cover Disassembly: passo 1, imagem 1 %32
    • Place device so that the top cover is facing you.

    • Open the top cover.

  2. Newport e500 Power Supply Disassembly: passo 2, imagem 1 %32
    • Remove the four hex nuts and lock washers (two at each hinge) that secure the cover to the hinges on the left side of the pneumatic box.

  3. Newport e500 Power Supply Disassembly: passo 3, imagem 1 %32
    • Remove the cover and set aside. Retain hardware for re-assembly.

  4. Newport e500 Power Supply Disassembly, Newport e500 Left Side Panel Disassembly: passo 4, imagem 1 %32
    • Carefully place the GDU on its right side with the front of the GDU facing you.

    • Remove the three screws and washers at the top edge of the left side panel.

  5. Newport e500 Power Supply Disassembly: passo 5, imagem 1 %32
    • Remove the two screws and washers from the underside of the left side panel.

  6. Newport e500 Power Supply Disassembly: passo 6, imagem 1 %32
    • Remove the left side panel. Retain hardware for re-assembly.

  7. Newport e500 Power Supply Disassembly, Newport e500 Right Side Panel Disassembly: passo 7, imagem 1 %32
    • Carefully place the GDU on its left side.

  8. Newport e500 Power Supply Disassembly: passo 8, imagem 1 %32
    • Remove the four screws and washers at the top edge of the right side panel.

  9. Newport e500 Power Supply Disassembly: passo 9, imagem 1 %32
    • Remove the two screws and washers from the underside of the right side panel.

  10. Newport e500 Power Supply Disassembly: passo 10, imagem 1 %32
    • Remove the right side panel. Retain hardware for re-assembly.

  11. Newport e500 Power Supply Disassembly, Newport e500 Flow Sensor Cover Disassembly: passo 11, imagem 1 %32
    • Remove the three screws and washers that secure the flow sensor cover to the pneumatic box assembly. Retain the hardware for re-assembly.

  12. Newport e500 Power Supply Disassembly: passo 12, imagem 1 %32
    • Remove the flow sensor cover.

  13. Newport e500 Power Supply Disassembly, Newport e500 Pneumatic Box Disassembly: passo 13, imagem 1 %32
    • Remove the two screws and washers (back corners), one screw and washer (exhalation module support bracket), and two standoffs and washers (front corners) that secure the pneumatic (upper) box assembly to the electronic box assembly. Lift the Pneumatics Box and carefully tilt to one side.

  14. Newport e500 Power Supply Disassembly: passo 14, imagem 1 %32
    • Remove cables from connectors J1, J2, J3, J4, J5, and J6 on the main PCB (4 connectors are not shown due to being blocked by the side panel). Note the position of these connectors for re-assembly.

  15. Newport e500 Power Supply Disassembly: passo 15, imagem 1 %32
    • If not already detached, remove the heater cables from J5 and J6 on the DC-DC power supply PCB.

  16. Newport e500 Power Supply Disassembly, Newport e500 Power Supply Disassembly: passo 16, imagem 1 %32
    • From the underside of the electronics box assembly, remove the four screws and lock washers that secure the power supply to the box assembly.

  17. Newport e500 Power Supply Disassembly: passo 17, imagem 1 %32
    • Disconnect cables from connectors J1 and J2 on the power supply.

  18. Newport e500 Power Supply Disassembly: passo 18, imagem 1 %32
    • Lift the power supply out of the electronics box assembly.

Conclusão

To reassemble your device, follow these instructions in reverse order.

Jared McMullen

Membro desde: 05/02/18

473 Reputação

Autoria de 4 guias

Equipe

Cal Poly, Team S7-G16, Paton Spring 2020 Membro de Cal Poly, Team S7-G16, Paton Spring 2020

CPSU-PATON-S20S7G16

Membros da 3

Autoria de 13 guias

0 comentários

Adicione um comentário

Exibir estatísticas:

Últimas 24 horas: 1

Últimos 7 dias: 1

Últimos 30 dias: 5

Duração total: 108