Ir para o conteúdo principal

How to Replace a Transition Strip (T Molding)

O que você precisa

  1. How to Replace a Transition Strip (T Molding), Transition Strip (T Molding): passo 1, imagem 1 %32
    • Measure the exact width of the doorway using a tape measure.

  2. How to Replace a Transition Strip (T Molding): passo 2, imagem 1 %32 How to Replace a Transition Strip (T Molding): passo 2, imagem 2 %32 How to Replace a Transition Strip (T Molding): passo 2, imagem 3 %32
    • Mark the T molding based on the doorway measure.

    • Cut the T molding using a sharp saw (table saw).

    • Cutting the T molding can be done for free at the place of purchase.

    • If you don't have access to a sharp saw, cut the T molding using a jigsaw and use sanding paper to soften the end.

  3. How to Replace a Transition Strip (T Molding): passo 3, imagem 1 %32 How to Replace a Transition Strip (T Molding): passo 3, imagem 2 %32 How to Replace a Transition Strip (T Molding): passo 3, imagem 3 %32
    • Remove the old T molding.

    • You can use a pry bar to loosen the T molding.

  4. How to Replace a Transition Strip (T Molding): passo 4, imagem 1 %32 How to Replace a Transition Strip (T Molding): passo 4, imagem 2 %32
    • Use a utility knife to remove all the glue or any material used to keep the old T molding in place.

    • You may use a scraper instead of a utility knife.

    • Clean up the area thoroughly.

  5. How to Replace a Transition Strip (T Molding): passo 5, imagem 1 %32
    • Apply the glue evenly to the gap.

  6. How to Replace a Transition Strip (T Molding): passo 6, imagem 1 %32 How to Replace a Transition Strip (T Molding): passo 6, imagem 2 %32 How to Replace a Transition Strip (T Molding): passo 6, imagem 3 %32
    • Insert the T molding into the gap.

    • Press the T molding firmly onto the ground.

    • No gap should exist between the T molding and the floorings.

  7. How to Replace a Transition Strip (T Molding): passo 7, imagem 1 %32 How to Replace a Transition Strip (T Molding): passo 7, imagem 2 %32
    • Tape the T molding onto the floor.

    • This step ensures the T molding stays in place until the glue dries.

    • Wait 24 hours for the glue to dry.

    • Remove the tapes.

Conclusão

To reassemble your device, follow these instructions in reverse order.

Rojean Noorinayer

Membro desde: 05/12/21

145 Reputação

Autoria de 1 guia

0 comentários

Adicione um comentário

Exibir estatísticas:

Últimas 24 horas: 4

Últimos 7 dias: 42

Últimos 30 dias: 173

Duração total: 4,398